Civil Earthworks

   

Miller Plant Limited has built up an enviable reputation in the area
for carrying out Civil Earthworks packages; Demolition, Site Clearance,
Contract Crushing and Drainage.  These include: -

Road projects
Schools
Housing
Medical Centres
Oil Companies – Offices, Yards and Car Parks
Care Homes
Housing Association
Quayside Harbour Developments
Coastal Defence and River banking
Golf Courses and All Weather Pitches


These contracts range in size and value from basic reduce levels and
off site to major cut and fill exercises.

Clientele We boast some very prestigious names on our cliental list from Multi
Nation Construction companies, House Builders, Land Developers, Local
Authorities, Civil Engineering Contractors right down to the small
local builders.

Safety and Environmental issues are high on our list of priorities and we are proud of our track record in both areas.  We have firmly established policies and procedures within the company which are available on request.

For more details on our Civil Earthworks division, or to discuss your requirements further please contact  Ian F Miller (Director) or David Simpson Estimator / Quantity Surveyor

Below are examples of past and recent Earthworks project undertaken by Miller Plant Ltd and a brief description of works

All Weather Pitch at St Machar Academy Aberdeen

Works included Topsoil strip, cut and fill, surplus materials off site, we also produced 2200 tonnes of recycled clean material from our Waste Transfer Station to act as free drainage, we also imported infill to create a disabled access to the All Weather Pitch.

Rosewell Care Home Aberdeen

Works included Topsoil strip, reduce levels, surplus materials off site, and recycled materials brought back in from our waste transfer station, following demolition of the old care home.

New Office Development Earthworks and Associated Drainage for Miller Plant Ltd

Site clearance works begins on the site of our new HQ, Works include topsoil strip and off site, import 12,000 m3 of structural infill to be spread and compacted in layers to meet compaction tests.

Dinnet Burn Footbridge and Associated Earthworks

Work included topsoil strip, reduce levels, formation of new access road to properties with 6F2 material and Sub base Type 1 all manufactured within the companies waste transfer station.

Industrial Development Kintore Aberdeenshire

Work included Bulk excavation of on site materials, crush material to manufacture a 6F2 spec product, cart and level on area to create platform for future development.

Waterloo Quay Development Aberdeen Harbour

Works began on a disused site to create a new container yard at Aberdeen Harbour, works included Bulk excavation and materials off site and fill to formation level using Type 1 Sub base manufactured within our waste transfer station.